Xi Impression | A reformer having deep roots with the people

高端学术盛宴:第二十一届英国高等教育汉语教学国际研讨会在纽卡斯尔大学成功举办

“行走中国·2024海外华文媒体川渝行”在重庆落幕

海外华媒见证重庆乡村振兴:金鳌“生金” 田园“共享”

海外华文媒体看两江新区:感受内陆开放“吸引力”

Xi kicks off state visit to Tajikistan, eyeing new heights in bilateral cooperation

Beijing preps for full operation of new metro line

发布时间:   来源: chinadaily.com.cn

The northern section of the Beijing Metro Line 17 has started its debugging, and it is expected to go into no-load operation in the third quarter and become operational by the end of this year.

With a total length of 49.97 kilometers and 21 stations, Beijing Metro Line 17 is fully underground and runs through four districts: Dongcheng, Chaoyang, Changping and Tongzhou.

The southern section of Line 17 went into operation at the end of 2021. The northern section spans 26.3 kilometers and has 10 stations. With eight-car type A trainsets, maximum speed can reach 100 kilometers per hour.

As the new line goes into operation, it is expected to ease passenger traffic pressure from Lines 5 and 13, further improving rail transit service in the Future Science City area, Huilongguan and Tiantongyuan neighborhoods in Changping district.

This year, Beijing will continue construction on 11 rail transit lines with total length of 231.3 kilometers, said Yang Liming, director of the No 1 department of rail transit under the Beijing Major Projects Construction Headquarters Office.

As the northern section of Line 17 and the remainder of Line 16 go into operation, Beijing's metro network will exceed 837 kilometers in length by the end of this year.

上一篇:International animation fest set to ignite Dongguan
下一篇:PLA dismisses fears over Rocket Force capability

首页   |   关于我们

Copyright © http://www.eurochinesedaily.com 欧洲侨报 版权所有