品世界咖香 赴一城烟火丨广州咖啡文化季

“五一”第二天,广东4A级及以上景区接待游客394.2万人次

指尖余温,心间芳华:英国纽卡斯尔大学首届中国文化周的古今对话

第六届亚洲沙滩运动会闭幕式在三亚举行

刚刚,浙江省长答记者问,着重讲了三件事

2025年我國詞元(Token)調用量約21100萬億次 呈現指數級增長

Beijing preps for full operation of new metro line

发布时间:   来源: chinadaily.com.cn

The northern section of the Beijing Metro Line 17 has started its debugging, and it is expected to go into no-load operation in the third quarter and become operational by the end of this year.

With a total length of 49.97 kilometers and 21 stations, Beijing Metro Line 17 is fully underground and runs through four districts: Dongcheng, Chaoyang, Changping and Tongzhou.

The southern section of Line 17 went into operation at the end of 2021. The northern section spans 26.3 kilometers and has 10 stations. With eight-car type A trainsets, maximum speed can reach 100 kilometers per hour.

As the new line goes into operation, it is expected to ease passenger traffic pressure from Lines 5 and 13, further improving rail transit service in the Future Science City area, Huilongguan and Tiantongyuan neighborhoods in Changping district.

This year, Beijing will continue construction on 11 rail transit lines with total length of 231.3 kilometers, said Yang Liming, director of the No 1 department of rail transit under the Beijing Major Projects Construction Headquarters Office.

As the northern section of Line 17 and the remainder of Line 16 go into operation, Beijing's metro network will exceed 837 kilometers in length by the end of this year.

上一篇:International animation fest set to ignite Dongguan
下一篇:PLA dismisses fears over Rocket Force capability

首页   |   关于我们

Copyright © http://www.eurochinesedaily.com 欧洲侨报 版权所有