打造“家门口”的阅读嘉年华!南国书香节广州分会场多点开花

看深圳:“奇迹之城”是开放创新合作鲜活案例

思想耀岭南丨对话张书彦:架起大科学装置与产业第一线的创新桥梁

智竞向未来!第二届世界人形机器人运动会在京开幕

“超级买家+超级卖家” 中国与世界双向奔赴

广东各地“电影+”促消费:游岛,阅读,浪漫打卡

Beijing preps for full operation of new metro line

发布时间:   来源: chinadaily.com.cn

The northern section of the Beijing Metro Line 17 has started its debugging, and it is expected to go into no-load operation in the third quarter and become operational by the end of this year.

With a total length of 49.97 kilometers and 21 stations, Beijing Metro Line 17 is fully underground and runs through four districts: Dongcheng, Chaoyang, Changping and Tongzhou.

The southern section of Line 17 went into operation at the end of 2021. The northern section spans 26.3 kilometers and has 10 stations. With eight-car type A trainsets, maximum speed can reach 100 kilometers per hour.

As the new line goes into operation, it is expected to ease passenger traffic pressure from Lines 5 and 13, further improving rail transit service in the Future Science City area, Huilongguan and Tiantongyuan neighborhoods in Changping district.

This year, Beijing will continue construction on 11 rail transit lines with total length of 231.3 kilometers, said Yang Liming, director of the No 1 department of rail transit under the Beijing Major Projects Construction Headquarters Office.

As the northern section of Line 17 and the remainder of Line 16 go into operation, Beijing's metro network will exceed 837 kilometers in length by the end of this year.

上一篇:International animation fest set to ignite Dongguan
下一篇:PLA dismisses fears over Rocket Force capability

首页   |   关于我们

Copyright © http://www.eurochinesedaily.com 欧洲侨报 版权所有