出走的订单,悄悄回流珠三角

蓉欧产业对话暨2026意大利制造日活动在成都新津举行

广东人形机器人“超级工厂”,如何练成?

“广货”如何圈粉老外?米兰小哥走进羊城创意园寻找答案

试吃的牙签根本停不下来!“食在广东”在农博会上具象化了

跨越国界的艺术礼赞:旅罗华侨朱荣富逐梦舞台,参演 Dan Puric 杰作《旅程》

Construction of Guangzhou Metro Line 24 to start in 2021

发布时间:   来源: 欧洲侨报

With the successful opening of the northern extension of Guangzhou Metro Line 8, Line 24, which has also been highly anticipated by locals, is also coming! According to news published by the Guangzhou Public Resources Trading Center, the construction of Metro Line 24 will start next year and is expected to be completed in 2025.

With a total length of 31.6 kilometers, Guangzhou Metro Line 24, a detached line project of the northern extension of Line 8, is an all-underground line with 18 stations, including 10 interchange stations. The average distance between stations is 1.83 kilometers. And the maximum speed will reach 100 kilometers per hour.

Stations of the Guangzhou Metro Line 24

Guangzhou North Station (transfer to Line 9)—Xiuquan Park—Yayao—Yayuan—Dongjing—Shenshan East—Shuili—Jiangfu (transfer to Line 8)—Taoyuan—Junhe—Baiyun Dalang—Xiamao—Huangshi—Baiyun Tangxi (transfer to Line 12)—Tangjing—Yuanjing—Ziyuangang (transfer to Line 11)—Sun Yat-sen Memorial Hall (transfer to Line 2 and Line 13)

The construction of Line 24 aims to connect Huadu and northern Baiyun districts with Guangzhou downtown. Therefore, the density of stations in the suburbs will be larger than downtown areas.

In the future, Line 24 will also adopt more new technologies, such as automated driving, smart metro, sustainable green rail transit, intelligent monitoring system, and disaster prevention technology.

上一篇:"14th Five-Year Plan" briefing offers Consulates a window into better understanding the relationship
下一篇:test

首页   |   关于我们

Copyright © http://www.eurochinesedaily.com 欧洲侨报 版权所有